Right after the second coat has dried, evaluate the consistency of the finish to find out if it needs a third coat, but don’t apply in excess of two topcoats every day. Keep rugs and furnishings off the floor for fifteen times to totally treatment. It's also possible to paint https://brotherfloors.com/