Lower the tongues from the boards with the wall edge. Eliminate the adhesive backing and start laying the planks from the corner, and leave a small gap. Minimize the final plank to suit. Start the second row using a shorter piece to make a staggered sample. Go on measuring and https://flooring-contractor-in-ja58990.widblog.com/86170659/5-simple-techniques-for-vinyl-flooring-installation-jacksonville