Installation Overview Newsome has efficiently finalised the installation and commissioning of a new 400 kW chiller at a well-known confectionery manufacturing site in York. This initiative demonstrates a substantial step forward in the client’s ESG agenda, enhancing operational resilience and achieving measurable reductions in both energy consumption and carbon output. https://1001bookmarks.com/story20579840/high-efficiency-400-kw-chiller-installation-delivers-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction